• Blue Circle - The second concern and reason for inspection. Four (4) of the Six (6) leaks found in the building are on this TPO roof system. Lack of maintenance and workmanship at seams are the cause of the interior leaks.
• Red Line - Found upon inspection. The perimeter of this Modified Bitumen system has pre-mature failure due to installation practices. This is causing the underside edges (soffit) to decay/rot. Some wood panels are now missing and many have water damage.
Phase 1 includes Goertz Hall Roof Replacement
Also included in Phase 1
Roof Leaks in Foyer Area & Roof Leaks in Main
Church Area
Replacement of 8 HVAC Units.
Patching and Repairs Needed
Exterior Lighting Needed
Exterior Concrete Work Needed